Booking window Evening and Saturday appointments are open through late autumn. Ask for a slot
Juniper Orbit Electrical Works Request a visit
Electrician testing circuits inside an open consumer unit with a multimeter

Domestic & small commercial electrics

Careful current, in old houses and new ones.

Juniper Orbit is a two-van electrical practice working on consumer units, fault finding, rewires, lighting and EV charge points. We survey first, quote in writing, and leave the paperwork behind us.

  • ArrivalTwo-hour arrival windows, confirmed the evening before.
  • PricingA written quote is agreed before any tool comes out of the van.
  • PaperworkTest results and certificates issued within two working days.

01 — Work index


What we are usually called out for.

Scope, the time a job normally takes on site, and what you are left holding afterwards. If your job is not listed, describe it in the enquiry form and we will tell you plainly whether it is ours.

Durations assume reasonable access to the board and to the route. We confirm them at survey, not over the phone.

01 Fault finding

Tracing a tripping circuit, a dead socket run or a light that dims under load. Split tests at the board, then along the circuit until the fault is isolated.

Half day
02 Consumer unit replacement

A metal board with RCBO protection per circuit, so one fault no longer takes half the house out. Existing circuits are tested before and after the swap.

One day
03 Additional sockets & spurs

New double sockets on an existing ring, or a dedicated spur for a fridge, a home office or a workshop bench. Chased and made good, or surface run in trunking where you prefer.

2–4 hours
04 Kitchen & bathroom circuits

Cooker points, extractor fans, under-cabinet lighting and zone-appropriate fittings, sequenced around the joiner and the tiler rather than against them.

1–2 days
05 Lighting design & install

Layouts planned room by room: task, ambient and a dimmable layer. Includes switching plans so the lights you use most are nearest the door.

1–3 days
06 Partial & full rewires

Staged room by room where you are living in, or floor by floor where the property is empty. Old rubber and fabric-sheathed cable removed, not buried.

4–10 days
07 EV charge points

Load assessment first, then a dedicated protected circuit to the parking position. Cable route agreed with you before anything is clipped to a wall.

One day
08 Garden & outbuilding supplies

Armoured supply to a shed, studio or garage with its own small board, outdoor sockets and weatherproof lighting on a separate switch.

1–2 days
09 Condition reports

A full inspection of the installation with coded observations, written so you can tell the urgent items from the housekeeping ones.

3–5 hours
Finished kitchen with layered under-cabinet and ceiling lighting switched on
Finished workKitchen lighting, switched in three layers
Tradesperson in a hard hat and high-visibility gear working on a building site
On siteFirst fix, sequenced with the other trades

02 — Which job is yours


Repair, upgrade, or start again?

Most people call an electrician without knowing which of these three they need — and the three cost very different amounts. Read the signs below before you book, and say which one sounds closest in your enquiry.

A — Repair

One thing stopped working

The rest of the installation is sound and reasonably recent. The fault sits in a single accessory, fitting or length of cable.

  • One socket or one light is dead, everything else is fine
  • A switch or socket face is cracked, loose or warm
  • A fitting buzzes or flickers only when a specific appliance runs
  • The board resets cleanly and stays on afterwards
B — Upgrade

The wiring is fine, the protection isn't

Cabling is serviceable, but the board or a particular circuit is no longer sized or protected for how the room is used now.

  • A plastic board, or one with rewirable fuses rather than breakers
  • Half the house goes dark when one appliance trips out
  • Extension leads have become permanent furniture
  • You are adding a charge point, a hob or a garden office
C — Rewire

The installation has reached its age

Repairs stop holding because the cable itself is at fault. Staging the work room by room keeps the house liveable while it happens.

  • Black rubber or fabric-sheathed cable behind the faceplates
  • Round-pin sockets, or no earth at the lighting points
  • Repeated unexplained trips on more than one circuit
  • A condition report with observations that keep recurring

03 — On the day


How a visit actually runs.

Nothing here is a surprise on the day, and nothing gets rushed at the end. The same five steps apply whether we are there for three hours or three weeks.

We work in dust sheets and take the offcuts with us. Power is only off for the periods agreed at step two.

01

Survey and quote

We look at the board, the route and the rooms involved, then send a written scope with a fixed price and the number of days needed. No work is booked until you accept it.

02

Isolation plan

Before anything is disconnected we agree which circuits go off, for how long, and what stays live — freezers, routers, medical equipment and home working all get planned around.

03

Install

Cable runs are set out and shown to you before they are chased or clipped. Accessory positions are marked in pencil first, because a socket in the wrong place is a wall repair later.

04

Test and demonstrate

Every altered circuit is tested and the results recorded. We then walk the job with you, switch by switch, so you leave knowing what each control does.

05

Certificate and tidy

Certificates and test schedules follow within two working days, along with a note of anything we spotted but did not touch. Waste cable and packaging leave with the van.

04 — Field notes


Worth knowing before we arrive.

Small things that make a visit shorter, cheaper, or simply safer. None of them require any tools on your part.

Clear the board

Most boards live in a cupboard behind coats, recycling or a vacuum cleaner. Twenty minutes of clearing can save an hour of careful lifting on the day.

Note when it trips

Write down what was switched on each time the breaker goes. A pattern across three events narrows a fault faster than any instrument does.

Don't re-set repeatedly

A breaker that trips again immediately is doing its job. Resetting it over and over hides the fault rather than fixing it — leave the circuit off and tell us which one it is.

Photograph the label

A photo of the board and its circuit labels, plus the sticker inside the lid, tells us the age and type of the installation before we set off.

05 — Questions


Asked most often.

Answers here are the same ones we would give on the doorstep.

Q1The whole house has gone dark. What should I check first?

Look outside first: if the street and neighbouring houses are dark too, it is a supply issue rather than yours. If it is only your property, open the board and look for a single device in the off position. Switch off the appliance you used last, reset once, and if it holds you have found the culprit. If it trips again straight away, leave it off and send us the circuit name.

Q2Why does one RCD keep tripping at the same time each day?

Timed trips usually point at something on a timer or thermostat — immersion heaters, outdoor lighting, heating controls or a freezer defrost cycle. Damp in an external circuit behaves the same way after rain. We test insulation resistance on each leg of the circuit cold, then under load, which separates a genuine fault from accumulated moisture.

Q3I'm letting the property. What do I need and how often?

Rented homes need a periodic inspection of the fixed installation, with a written report you can hand to the tenant and the agent. We schedule these around tenancy changes where possible, since an empty flat takes half the time of an occupied one. Any coded observations come with a plain-language note of what must be done now and what can wait for the next cycle.

Q4I'm in a flat or a leasehold building. Do you need permission?

Work inside your own demise is usually straightforward. Anything touching the incoming supply, the riser, communal areas or the building fabric normally needs the freeholder or management company to agree first. Tell us at enquiry stage and we will write the scope in a form you can forward to them, rather than you having to translate it.

Q5Can small jobs be combined into one visit?

Yes, and it is nearly always cheaper. A half-day slot comfortably absorbs several sockets, a couple of light fittings, an extractor fan and a few faceplate changes. List everything in the enquiry, including the jobs you assume are too minor to mention — those are the ones that get forgotten and become a second call-out.

Q6What happens if you find something unexpected mid-job?

We stop and show you. Older properties hide junction boxes under floors and buried joints in walls, and the honest answer is that no survey finds all of them. You get a photograph, an explanation of whether it is dangerous or merely untidy, and a revised price for the extra work before we continue. Nothing chargeable gets added without your agreement.

06 — Request a visit


Tell us the job.

The more you can describe now, the more accurate the survey slot and the quote will be. We reply to every enquiry, including the ones we are not the right practice for.

Coverage
Juniper Vale, Orbit Quarter, Halloway Fields, Netherstone and the villages along the north ridge.
Working hours
Weekdays 8am–5pm, with evening slots on Tuesdays and Thursdays and Saturday mornings by arrangement.
Response
Enquiries are answered within one working day; survey visits are usually offered inside the same week.

We use what you send here only to answer your enquiry and plan the survey.